SENSEX
NIFTY
GOLD
USD/INR

Weather

image 29    C

Andhra Pradesh News

Andhra Pradesh / The Hindu

details

Andhra Pradesh Transco submits final proposal for Green Energy Corridor-III to CEA: JMD Kirti

The project was aimed at connecting 11 Gigawatts of solar power and 7,373 Megawatts of Pumped Storage Hydropower Projects to the grid at an estimated cost of 28,033 crore

15 Aug 2025 3:41 pm